Project Story
Trusted by Fairatmos
Aims to address the increasing electricity demand in Jakarta which grows at an average rate of 6.2% per year, the plant, with a capacity of 500 MW, utilizes the latest gas turbine technology (M701F5), achieving a 62% efficiency in combined cycle operation. This efficiency helps minimize emissions, contributing to more sustainable energy production in the region
Certification
Project Benefits
Climate Benefits
Supplying 500 MW of renewable energy, reducing 927,113 tons of CO2 emissions in 2022 by replacing coal power plants, and increasing renewable energy's contribution to local and national energy mixes.
Sustainability Development Goals (SDGs) Impact
Fairatmos Evaluation Criteria